The plant is to be operational by March 1962. The specified output is 1 Mwe and 7 million Btu/hr of heat. ![]() The objective of the contract is the design, development, fabrication, installation, and initial testing and operation of a prepackaged air- transportable pressurized water reactor nuclear power plant, the PM-1.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |